2015 Video Renderings

Please note the following videos were developed in 2015 for Open House #4 and have not been updated since. They are intended to provide a visual representation of proposed project elements, including elevations and roadway and bridge widths, for the different operational configuration options.

These videos do not reflect changes to project staff or changes to the regional transportation landscape since 2015, such as the completion of the MoPac Improvement Project between Cesar Chavez Street and Parmer Lane, which was completed in 2017. All six operational configurations would provide connections to the existing MoPac Express Lane.

1A. Video explanation of the One Express Lane + Downtown Direct Connection operational configuration option.

 

1B. Video explanation of the One Express Lane without Downtown Direct Connection operational configuration option.

 

2A. Video explanation of the Two Express Lanes + Downtown Direct Connection operational configuration option.

 

 

2B. Video explanation of the Two Express Lanes without Downtown Direct Connection operational configuration option.

 

2C. Video explanation of the Two Express Lanes + Elevated Ramps near Barton Skyway/Bee Cave Road operational configuration option.

 

Contact Us

3300 N. IH-35 Suite 300
Austin, TX 78705

(512) 342-3299 Email Us
Contact Us

3300 N. IH-35 Suite 300
Austin, TX 78705

Call (512) 996-9778
Email Us